Totomengies will provide ‘renewable energy’ to Hunosa

Tooengies is an integrated worldwide energy company that produces and market energies: oil and Biofuels, natural gas and green gases, renewable energy and electricity. They have more than 100,000 employees who are committed to offering the best possible number of people a more reliable, more affordable and sustainable energy.

Javier Sáenz de Jubera, president of Total energy Electricity and gas, he stated that ‘it is a proud of Totomengies works with Hunosa, an important company in the history of industry and energy in Asturia And Spain. This new project consolidates us as a reference partner for the industrial sector of the region, with a wide range of solutions that adapt to the needs of each customer to offer more affordable, sustainable, reliable and accessible energy.

Enrique Fernández, president of Grupo Hunosa, emphasized ‘the importance of an electric contract on which the Delivery for strategic projects linked to new energies And also the obligations of the company as a mining company, including the known as ‘eternal costs’ derived from the pumping of water and the work of Postclausura “.

More details about this agreement between Totan Energies and Hunosa

Total energy, Integrated Global Energy Company has received the Bunosa Electric Supply Bidding, a historic Asturian company. This contract, worth more than 7 million euros, consolidates the position of Total energy as an ally for The energy transition of the industrial sector and as a relevant actor of the Asturian economy. The contract, which lasts a year with an annual renewal option, extends until 28 February 2026.

He Agreement includes the energy supply up to 56 business provision pointsWith an annual volume of 65,427 MWh. These delivery points correspond to the San Nicolás Goed, the Batán Laundry Room or the Pereda Thermal Power Plant and other centers that are closed or are in the process of abandonment.

Two of the delivery points, the Fondón Well and the Barredo Well, receive 100% renewable electricity certified with guarantees of origin, while in the Other offer will meet the availability of the market.

The tender assumes the “Pass Pool” modality, With which the price of electricity that is supplied to that of energy in the market is linked in real time, but the rest of the final components have been determined.

With this option, Hunosa can better control your energy costs and avoid unforeseen Related to the wholesale market, because the energy costs will depend on its time consumption pattern. So, so, Total energy It enables the company to effectively and competitively optimize its energy management.

In line with your Business approach to energy transformation, carbonThe use of renewable energy sources, the solutions based on circular economy and nature, the state of Society is dedicated to the efficiency in energy consumption and the implementation of actions.

And measures to promote energy savings: Installation of photovoltaic plants of self -consumption and geothermal systems In his facilities, realization of an energy audit at company level, dedication to electric cars and replacement of equipment for more efficient.

The low -carbon of the Asturian economy is a priority

Total energy That is why the portfolio of institutional and industrial customers in Asturia, where the company has a head office and has more than 700,000 contracts. The Energy has been awarded with other contracts, by the city of Oviedo Already via the Company Transporta Unidurias (TUA), the electrification of the garages of the urban buses from Oviedo.

Ha too completed a photovoltaic installation on the Luis Adaro FairgroundVan Gijón, which delivers 23% of the energy consumption of the Chamber of Commerce with renewable electricity. The company has also awarded the gas supply to more than 50 buildings of the city of Oviedo, as well as the University of Oviedo.